You are here
STARTING WITH EXTERNAL POWER
UNDER CONSTRUCTION
STARTING WITH EXTERNAL POWER SOURCE | STARTING WITH EXTERNAL POWER SOURCE | ||||
Master Switch | OFF | Battery Master Switch | OFF | ||
All Electrical Equipment | OFF | Alternator Switch | OFF | ||
Terminals | CONNECT | Terminals | CONNECT | ||
External Power Plug | INSERT ON FUSELAGE | External Power Plug | INSERT ON FUSELAGE | ||
PROCEED WITH NORMAL START | PROCEED WITH NORMAL START | ||||
Throttle | LOWEST POSSIBLE RPM | Throttle | LOWEST POSSIBLE RPM | ||
External Power Plug | DISCONNECT FROM FUSELAGE | External Power Plug | DISCONNECT FROM FUSELAGE | ||
Master Switch | ON - CHECK AMMTER | Master Switch | ON | ||
Oil Pressure | CHECK | Oil Pressure | CHECK | ||
Alternator Switch | ON - CHECK AMMETER |